Sichuan-Tibet Railway Initiation Project

Project Background

The railway starts Sichuan ends Tibet, with a total length of 1838 kilometers. It is widely recognized by the engineering community as the "most difficult railway to build in human history" and even referred to as an "impossible to build" project by foreign media.


Difficulties in Blasting
  • -38℃~75℃
    Temporal and spatial differences in temperature
  • Extremely High
    Probability of rock burst
    12% → 5.8% for >1.3m boulders
  • 23%
    Ecological protection area coverage
    12cm/s → 6cm/s max velocity
  • 60%
    Reduced manual efficiency by AMS
    $0.8/ton ore reduction









Key Achievement
  • 0.001%
    Failure rate
  • >70%
    Rock Burst Reduced
    12% → 5.8% for >1.3m boulders
  • 65%
    improved daily excavation efficiency