“Enable large-scale electronic detonator blasting in open-pit coal mine”

Project Overview

As the world's largest hydropower project, the Medog Hydropower Station redefines engineering excellence. With an installed capacity of 60-81 GW (3x the Three Gorges Dam) and annual output of 300-400 TWh, it will supply 4.5% of China's total electricity demand—equivalent to powering 300 million households. This $120 billion megaproject harnesses the Yarlung Tsangpo River's 2,230-meter natural drop through 4-6 tunnels (20-35 km each), overcoming Himalayan seismic zones and 70°C tunnel temperatures.

Technical Challenges

  • Geological Mastery: Designed to withstand M8.5 earthquakes, the project employs flexible concrete tunnels and 3D seismic isolation systems, navigating 5 major fault lines.
  • Precision Blasting Technology: Digital electronic detonators enable microsecond-level detonation control, reducing vibration by 80% during tunnel excavation—critical for protecting the fragile ecosystem of the Yarlung Tsangpo Grand Canyon.
  • Sustainable Innovation: Preserving 30% of natural river channels and maintaining 800 m³/s ecological flow ensures minimal impact on biodiversity.

Solutions

As the exclusive provider of electronic detonator control modules, Chipdance's technology ensures pinpoint accuracy in blasting operations. Its microchip-based timing systems (±1ms precision) and real-time network monitoring have been instrumental in excavating the project's 2400-meter-deep tunnels, where traditional methods would risk catastrophic rockbursts.

Implementations

  • Exclusive Supplier

    Typical operating current < 15μA

    Built-in RC oscillator with a frequency of 200KHz

    1
  • World-class Project Participant


    2
  • Extremely Stable Quality

    Typical operating current < 15μA

    Built-in RC oscillator with a frequency of 200KHz

    3
  • Annual Consumption 10 Million

    Typical operating current < 15μA

    4
  • Enhance Project Lifespan

    Typical operating current < 15μA

    Built-in RC oscillator with a frequency of 200KHz

    5

Results

Precision: Initiation time deviation ≤0.5ms
Safety: Zero incidents with 3 potential risk interceptions
Client Feedback: "Chipdance's technology solved our long-standing large-scale blasting challenges"

"This successful 1,033-detonator cascade operation demonstrates Chipdance's capabilities in the global mining market, paving the way for further collaborations in intelligent blasting solutions.."

Note: Key data sourced from official project announcements and engineering reports (2025).